Design concept by Thijs de Wit – not a live website
Goldstrike

GSTK tokenomics.

Clear supply rules are central to trust. This page sets out what has been decided and what will follow in the whitepaper.

Licence application in progress

Key facts

Built on Ethereum · ERC-20

Token standard
Ethereum-based ERC-20 token
Ticker
GSTK
Total supply
1,000,000,000 GSTK
Contract
Not yet deployed
Status
Planned. No tokens have been issued.

An established standard.

ERC-20 is the most widely used token standard on Ethereum. It is supported by common wallets and tools, which keeps GSTK simple to hold and to verify once it is deployed.

One token, one asset base.

GSTK is intended to represent participation in a single project whose design is anchored in real-world assets: a gold reserve and an intended allocation to Real-World Growth Assets (real estate, water, AI and energy). The exact relationship between tokens and reserve assets, including any rights attached to the token, has not yet been set. It will be defined in the whitepaper. Holding GSTK is not intended to confer ownership of specific gold or other assets.

TOTAL SUPPLY ISSUED CIRCULATING
TOTAL SUPPLY · ISSUED · CIRCULATING — Illustrative only, not to scale and not representative of any figures.

Three layers of supply, kept distinct.

  • Total supply

    The maximum that may ever be created under the token's rules. A ceiling, not an amount in circulation.

  • Issued supply

    Tokens that will actually have been created within that ceiling, according to issuance rules to be published in the whitepaper.

  • Circulating supply

    The part of issued tokens freely held by participants, excluding tokens that are reserved or locked.

Distribution.

How the supply is to be distributed, including any lock-up periods, has not yet been finalised. It will be set out in the whitepaper before any token sale.

A planned token sale.

A token sale (ICO) is planned as part of the roadmap. No date, price or terms have been set. Any sale would only take place after the required documentation, including a whitepaper, has been published, any required approvals are in place, and only where it is permitted.

Request the whitepaper